top of page

RO plant at Mushroom Grower

Customer Needs


This project involved of design, supply and install and commission of a 4000 L/h RO plant.


The client is a leading mushroom grower in New Zealand with great vision and goal in decarbonisation / carbon emission reduction. One of their biggest project is to replace the existing fossil fuel boiler with electrode boiler.


As such, they required a new RO plant to supply the feedwater for their electrode boiler for steam generation that will be used in many applications including room temperature control, products cleaning and pests / disease management.


Our Delivery


The RO plant we designed and installed includes

  • pre-treatment system (Pre Activated Carbon Filter + dual softener + 5μm filter + 1μm filter + Post Activated Carbon Filter )

  • 1 pass 2 stage RO

  • CIP system



The system is designed to operate automatically using tank level as control without any manual intervention.


System Outcome


The RO plant was successfully delivered with exceptional quality requirement to allow the boiler operate in optimum condition.


  • Total Free Chlorine : < 0.1 ppm

  • Total Free Chloride : < 0.1 ppm

  • Total Hardness : < 1.0 ppm

  • Conductivity : <5 μS/cm



Location

Christchurch

Capacity

4000 L/hr

Application

Boiler Feedwater

bottom of page